Overseas access: www.kdjingpai.com
Bookmark Us
Current Position:fig. beginning " AI Answers

How to optimize the efficiency of Fast3D's commercial model output to reduce project cost?

2025-08-21 405

Commercial Grade Cost Control Methodology

The following combination of strategies is recommended for the high-frequency usage needs of commercial projects:

  • Credit Point Optimization::
    - Do a low-precision test version first for batch generation (consumes 5 credits/each)
    - Re-generation of confirmed models at high quality (up to 600 credits)
  • Subscription Plan Options::
    - Monthly production < 50 models: select Starter package ($29/month)
    - 50-200 Models: Pro Package Saves 42% over Single Purchase
    - Large number of requirements: Enterprise solution supports API access
  • Asset reuse::
    1. Establishment of an in-house modeling library
    2. Use of the "modify description to regenerate" function for similar projects
    3. Standardized storage of basic components (e.g., screws/tables and chairs)

Practice has shown that the 3D modeling cost of commercial projects can be controlled at less than 1/5 of the traditional outsourcing price by the above method.

Recommended

Can't find AI tools? Try here!

Just type in the keyword Accessibility Bing SearchYou can quickly find all the AI tools on this site.

Top

en_USEnglish